Project

General

Profile

Actions

Bug #70

open
OF PK

task_summary_2

Bug #70: task_summary_2

Added by Olivier Feutseu about 1 hour ago.

Status:
New
Priority:
Normal
Assignee:
Start date:
03/16/2026
Due date:
04/17/2026 (19 days late)
% Done:

0%

Estimated time:
24:00 h

Description

Preparation and mapping for the migration of WTDocuments and their content in the test system
Support during multiple attempts to implement the migration solution, including number mapping
Preparation of a second migration (EPMDocument, WTDocument, table families, CAD structures, ReferenceLink, CONTENTMETADATA with WBM) in the test environment, with mapped numbers except for table families
Support in preparing the migration based on the live system, fully driven by metadata
Reconstruction of table family tables based on data extracted from the database
Execution of WBM processes and error correction
Support during the post-go-live phase
Analysis and corrections related to numbering
Analysis and mapping of files for replacement in the vault
Preparation of updates for date corrections

No data to display

Actions

Also available in: PDF Atom